The restoration is now picking up pace with the fabrication of the regulator lever assembly and its fitment to the boiler backhead. The main steam pipes have now been assembled in the smokebox.

IMG 20180815 WA0000

IMG 20180815 WA0001

IMG 20180815 WA0002

IMG 20180815 WA0003