Boiler
washouts Derrick
and Kevin were busy with boiler washout on the Fowler roller and Robey
portable. Ratanga
No. 6
Here Wouter is busy welding the door frame for the Ratanga 6 coach. After fitting the doors to the main frame he fitted the wood in the doors.
Here the one bogie was removed and replaced with one that is in better condition.
We had to remove the one B-bogie’s side panels so that both could fit in the container.
We loaded all the side panels on a trolley and moved it to where Henk could load it with the forklift into the other B-bogie.
The truck with the container arrived on the farm and we were ready to load.
After
securing every thing in the container the B-bogies were on their way to
their new destination. Cleaning
of storage area
We
started with the cleaning and tidying of the store area in the back of
the steam shed.
|
||||
|
||||